There could be public transport bottlenecks in the Lower Engadine in summer 2019
The closure of the Rhaetian Railway line has been in place since 11 March and will last until 7 September 2019. Travel through the Vereina Tunnel or via Zernez from the Upper Engadine is still by train, but between Susch and Scuol you will have to switch to replacement buses from PostBus. These (almost) all have a rear rack for up to five bikes, and there are also five trailers for up to 15 bikes in Scuol. During normal operation in the summer, bike transport should work smoothly, although there may be bottlenecks on peak days. Groups in particular should check with the Rhaetian Railway or PostBus Graubünden in advance or register their requirements.
A note for rent-a-bike users: The return station at Scuol station will be closed during the total closure and will be back in operation from September 8, 2019. At the National Park Bike Marathon, bike transport by public transport is guaranteed.
Further information on the closure of the route:
rhb.ch/en/company/projects-dossiers/totalsperrung-unterengadinNote: This content has been automatically translated from German. Please report any incorrect translations.